Ribble Link HA Pipeline

Utilities – Water
Project
Ribble Link HA Pipeline
Client
United Utilities
Value
£13,300,000
Project
Ribble Link HA Pipeline
Client
United Utilities
Value
£13,300,000

13km of 600dia ductile iron pipes were laid between Laundwood PS and the Haweswater Aqueduct and between Clitheroe Rd, Waddington and Lowcocks Service Reservoir.

Both civil and MEICA modifications  were made at Laundwood Pumping Station and Lowcocks Service Reservoir, along with the construction of chemical dosing building and equipment and connections to existing distribution mains and aqueducts.

Line valves installations were carried out on the Ribble Siphon of the Haweswater Aqueduct, including the construction of a valve house. Reinstatements included extensive land drainage replacement.

The work also involved the crossing of numerous watercourses and main river together with crossing and reinstatements to river walls and banks along with temporary works. Liaison undertaken with the EA for temporary works and discharge consents along with silt and run off protections.

The project was situated in the heart of the Trough of Bowland an area of outstanding natural beauty including Ancient Woodland and Duchy Land and involved significant environmental, operational and third party management and constraints.

Awards & Accreditations

Green Organisation
Awarded Green Apple National Bronze Award for Environmental Best Practice

Similar Case Studies

Image currently unavailable
Whitendale X Pipeline ▪ Utilities – Water
Image currently unavailable
Damas Ghyll ▪ Utilities – Water
We're celebrating
60 years in business
1966 2026