Damas Ghyll

Utilities – Water
Project
Damas Ghyll
Client
United Utilities
Value
£459,000
Project
Damas Ghyll
Client
United Utilities
Value
£459,000

Increasing the overflow capacity of an existing reservoir and improving the stability of the earth embankment.

Works included the construction of a new 160m long reinforced concrete wave wall keyed into the existing puddle clay core of the embankment using plastic sheet piles to maintain water tightness. Construction of a 13m wide reinforced concrete spillway weir within the existing earth dam embankment including retaining walls and reinforced footings. Formation of a 60m long revetment block spillway channel was undertaken re-using site won materials. Construction of a new stabilising berm on the downstream face of the embankment together with associated drainage.

General landscaping was also carried out upon completion.

Similar Case Studies

Image currently unavailable
Ribble Link HA Pipeline ▪ Utilities – Water
Image currently unavailable
Whitendale X Pipeline ▪ Utilities – Water
We're celebrating
60 years in business
1966 2026